November 14 General Obligation Bond Election November '23

Proposition

"Shall the City of Moore, Oklahoma, incur an indebtedness by issuing its bonds in the amount of Forty-Nine Million Three Hundred Ninety Thousand Dollars ($49,390,000) to provide funds for the purpose of constructing, reconstructing, improving or repairing streets or bridges in said City, to be owned exclusively by said City, and levy and collect an annual tax, in addition to all other taxes, upon all the taxable property in said City sufficient to pay the interest on said bonds as it falls due, and also to constitute a sinking fund for the payment of the principal thereof when due, said bonds to bear interest at not to exceed the rate of 7 per centum per annum, payable semiannually and to become due serially within 20 years from their date?"   
The specific projects for which at least seventy percent (70%) of the proceeds of the aforesaid street or bridge bonds shall be expended, and the dollar amounts for each such project shall be as follows: 

Drawing of Shields Blvd & NW 27th Street

Resurfacing of Shields Boulevard and NW 27th Street Intersection, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Graphic of proposed improvements to Telephone Rd.

Resurfacing of Telephone Road between SW 19th Street and SW 34th Street, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Graphic of improvements to SW 34th between Little River and Eastern

Engineering and design expenditures and Resurfacing of SW 34th Street between Little River and Eastern Avenue, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Graphic of proposed Roundabout at Broadway and Eastern

Resurfacing of Broadway Avenue /Eastern Avenue Roundabout and SE 24th Street Realignment Phase 1, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Graphic of proposed improvements to the intersection of S.19th and Tower/Broadway to Eastern

Resurfacing of South 19th Street and Tower/Broadway Avenue Intersection to Eastern Avenue Phase 2, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement  6,120,000    

Graphic of proposed improvements to S. Broadway from Eastern to Willow Pine

Resurfacing of South Broadway Avenue between Eastern Avenue and Willow Pine Avenue Phase 3, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Graphic of proposed improvements to the intersection of SW 19th and Santa Fe

Engineering and design expenditures and Resurfacing of Santa Fe Avenue and SW 19th Street Intersection, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

This line item is dedicated for miscellaneous concrete panel replacement, as well as asphalt mill and overlay work, on arterial roads throughout the city.  These funds are for ongoing repair and maintenance projects that occur outside of the designated projects that are listed in this proposition and are smaller in scope.

Engineering and design expenditures pertaining to the resurfacing of Shields Boulevard and NW 27th Street Intersection, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Engineering and design expenditures pertaining to the resurfacing of Main Street from Broadway Avenue to Eastern Avenue, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Engineering and design expenditures pertaining to the resurfacing of Eastern Avenue from NE 12th Street to NE 27th Street, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Engineering and design expenditures pertaining to the resurfacing of Eastern Avenue from Broadway Avenue to SW 34th Street, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Engineering and design expenditures pertaining to the resurfacing of NE 27th Street from Eastern Avenue to Interstate 35, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement 

Engineering and design expenditures pertaining to the resurfacing of NW 27th Street from Shields Boulevard to Interstate 35, including necessary curb and guttering, storm drainage improvements, sidewalks, streetscape and utility line replacement